Ask before you sign
Once the lease is signed, options shrink — clarify these to avoid redesign and overruns.
Confirm shopfront specs early so you don't change halfway through renovation.
- 1
How must the shopfront open?
Does the mall/building require an open front, or must a door be installed? Sizes and materials follow management rules.
- 2
Crystal shutter required?
Transparent shutter specs, height and materials — branded or not? Affects quote and programme.
- 3
Are water/electric meters enough?
Cookers, cold rooms and extract draw heavy load. Undersized meters mean upgrades and licence delays.
- 4
Ventilation and drainage?
Existing extract points, fall of drains and grease trap locations shape kitchen layout and fire/vent drawings.
- 5
Any UBW (unauthorised building works)?
Roof, lane or glasshouse UBW can stall licensing. Check ownership/status before signing.
- 6
Layout vs budget and fire design
Shopfront choices drive renovation budget and fire design. Rough-check kitchen, seating and escape before lease.
